Tuesday, January 17, 2006

Archive Alert

Monthly Blogs Have Daily Posts

These are Posted Sequentially

If BLOG Ends Before Month


Check Archives for ALL Pictures for That Month

Concrete Still $120/yd - Completing Forms and Setting GlueLam Beams - Thunderstorms Keep Things Wet Posted by Picasa

Heavy Frost 20051005!  Posted by Picasa

Floor Beams from Celti Kiva to External Perimeter of 60' Dome Foundation Posted by Picasa

Double Rainbow Over Gerry's Shop - Our Oats are Ripe Posted by Picasa

Footer for Spiral Stairs Out of Celtic Kiva Posted by Picasa

Pillars and Beams Showing Steel Brackets on Exterior Beams Posted by Picasa

16 Beams in Place - Now Supported by Cribbing Each One will Rest in Pocket Created by Pour of 60' Dome Stemwall
 Posted by Picasa

Flooring Joists are Brilliant on a Stormy Day
Cribbing Support Visable
We had to Build 10 Cribs to Support Beams Until Concrete is available
Beams Will Rest in Beam Pocket When Stem Wall is Poured  Posted by Picasa

Price of Concrete Back to $84
Pouring 60' Dome Footer at 2 pm Oct 12, 2005 Posted by Picasa

Floor Joists Installed on 3 Rectangle Segments - Waiting for 14' 2x8's  Posted by Picasa

South Curve of Footer
 Posted by Picasa

West Half of Footer - ARXX Stemwall Forms in Cellar Posted by Picasa

Footer for Ramp into Cellar - with 60' Dome Footer to Right and Cellar Stem Wall Forms to Left Posted by Picasa

60' Dome ARXX Stemwall Forms in Place Posted by Picasa

Preparing to Set Arxx Building Products forms for 60' Dome Footer Posted by Picasa

Full Moon Setting (top center) Over Completed 60' Dome Foundation  Posted by Picasa

60' Stemwall Pour Commencing on East Side Posted by Picasa

Sam and John Pouring Stemwalls 9' Below in Celtic Kiva - Above to West Pouring 60' Stemwall Continues as Conveyor is Reset - Deliver Tube at Top Right Posted by Picasa

Completing 60' Stemwall Pour on West Side - Second Cement Truck Setting Up to Pour Stemwall in Celtic Kiva Posted by Picasa

Second Cement Truck Pouring Concrete into Stemwall located 9' Below for Celtic Kiva Posted by Picasa

Completed 60' Dome Foundation Posted by Picasa

60' Dome Floor Joist Installation - Spider Web Appearing as Designed - see http://maazoetsoh200508.blogspot.com/
 Posted by Picasa

Saturday, October 01, 2005

60' Dome Sub-Floor Completion


60' Dome Sub Floor Installation Posted by Picasa

60' Dome Floor Joists


60' Dome Floor Joists Nearly Completed

Center Floor Joists Remain to do
After Triangle Sections Are Finished
Small Post and Beam Added so
Cut Lumber can Span Triangle Width at Perimeter Posted by Picasa

60' Dome Floor Joists


60' Dome Floor Installation by John & Gerry  Posted by Picasa